
Updated November 2026 | Technical Configuration & Pipe-Shop Engineering Reference A rollout wheel chuck with an
Skyhook positioner (also known as L-type hanging welding positioner) is a robotic 2-axis / 3-axis synchronized welding positioning device. Featuring a cantilever suspended workpiece structure, it provides full accessibility to bottom, back and inner weld seams without base interference. Widely used for engineering machinery frames, box structures, vehicle chassis and robotic welding cell automation.
Main frame: Q235-B heavy steel plate, stress-relief annealed
Heavy-duty slewing bearing, high load capacity and long service life
Integrated high-current welding slip ring, supports MIG / TIG / SAW heavy current welding
Full protective enclosure, IP54 protection grade
Suspended cantilever design, zero dead-angle welding for irregular structural parts
| Feature | Specificatie |
|---|---|
| Rated Load Capacity | 500 kg–10,000 kg (customizable) |
| Allowable Eccentricity | ≤200 mm |
| Working Axis | 2-axis: 360° Table Rotation + ±180° Arm Tilt; 3-axis: 360° Rotation + ±180° Tilt + Vertical Hydraulic Lifting |
| Drive System | Full servo motor + precision planetary reducer (standard); hydraulic cylinder for lifting axis |
| Rotatiesnelheid | 0.05–1.0 rpm, infinitely variable speed |
| Tilt Speed | 0.1–0.8 rpm, smooth and stable operation |
| Positioning Repeat Accuracy | ±0.05°–±0.1° (servo synchronized) |
| Control Mode | Hand pendant + PLC + HMI touch screen |
| Communication Interface | Support 485 / Ethernet, compatible with robot linkage |
1. Full servo synchronous linkage with welding robot
2. Hydraulic vertical lifting system
3. Custom rotary table size and clamping fixture
4. Anti-collision safety system
5. CE standard electrical system & international voltage conversion
6. Custom swing radius and effective working height
Automatic robotic welding cell, construction machinery frames, agricultural equipment, pressure vessel structural parts, vehicle chassis, steel box beam fabrication.

Updated November 2026 | Technical Configuration & Pipe-Shop Engineering Reference A rollout wheel chuck with an

By GW • Reviewed by Wuxi Yuanpeng Machinery Equipment Factory Technical Team • Updated November 2026

This document was reviewed by the Wuxi Yuanpeng Machinery Equipment Factory technical team, November 2026 A
WhatsApp ons